
Instrumentpanel för realtidsövervakning
Total aktiv effekt
5 439 MW
Aktiva reaktorer
5
Underhåll
1
Avbrott
0
Total utnyttjandegrad
76 %
Planned outage further prolonged due to additional maintenance.
Planned valve test will be performed at 08.11.2025. Power decrease will start 08.11.2025 at 03.00 am. After event stop, power will increase and full power is expected 08.11.2025 in the afternoon.